MOORING SYSTEMS
-
Mooring System Design for:
-
FPSO, FSO
-
Offloading Analysis
-
CALM Buoys
-
Floating Wind Mills
-
Riser Tower Structures
-
Barges, Semi-subs, SPAR, et
-
FLNG & Tankers
-
Jetty Mooring Systems
-
Marginal fields disconnectable systems.
-
Chain, wire , Polyester line sizes
-
Drag anchor & Pile designs, suction anchors etc.
S.U.R.F.
-
SURF & Subsea Architecture
-
SURF Design & Engineering
-
Risers, Umbilicals & Power Cables
-
Floating & Subsea Hoses
-
Structure & Seabed Interaction
-
On Bottom Stability
-
Scour Calculations
-
Subsea Pipelines, Flowlines & PLEMs
-
Gravity Based Structures
-
Span Calculation
-
Embedment Calculation
-
Cable & Pipeline Protection Systems
-
Soil Erosion Prevention
HYDRODYNAMICS
-
1st order (Linear) and 2nd order radiation/diffraction (3D BEM)
-
Wave-current interaction to evaluate wave drift damping
-
Multi-body interactions with different mechanic connections
-
Dynamic effects of liquid motion in tanks
-
Dynamic Positioning Analysis of DP –vessels behavior and DP-plots.
LNG FSRU
-
Design of Permanent and temporary disconnectable LNG Terminals for FSU's
-
Dynamic hose analysis for LNG cryogenic hoses.
-
Side by side LNG Offloading Analysis.
-
Offshore installation analysis, procedures and management.
-
Side by side hydrodynamic behaviour and interactions. The use of specialised software to calculate the fluid dissipation which is critically important to get realistic prediction of resonance in the gap between two ships.
-
Tank sloshing analysis.
-
LNG Terminals for remote locations.
-
Transfer of LNG through the floating terminal to the power station for direct use.
TEMPORARY MOORING AND PRODUCTION SYSTEMS
-
Vessels of different sizes can be moored.
-
Fast production is achieved.
-
Different environmental conditions can be applied depending on the size of the vessel and the chosen system, and the field life.
-
For low CAPEX fields the complete system is cost effective and can be rented from DEEPBLUE.
-
DEEPBLUE Pte Ltd has successfully designed, engineered and installed the Temporary Mooring System in South East Asia for 3 Clients and 6 vessels.
DYNAMIC POSITIONING
-
DP positioning requirements calculations.
-
DP positioning plots including waves and drift loads from waves.
-
DP excursion plots with wind, current and waves.
-
we take your existing DP Plots and upgrade them with wave data.
-
Our consultant provides:
-
DP onsite training and familiarization
-
DP operations documents
-
Charterers DP survey
-
DP crew competency checks