We were asked to join forces with Kavin Engineering for the upgrade of two Fields in Saudi Arabia. DEEPBLUE was asked to engineer & design the subsea cable and other ancillary items between the two platforms located 3,4 km away from each other.
The engineering, design project for the 15kV subsea cable was completed a few months ago, and the updates on the fields will be completed soon.
Comments