top of page
Search
  • Yves De Leeneer

FPSO Armada Sterling V, installation engineering.

The FPSO Armada Sterling V, converted by SPOG was successfully installed. We are delighted to be able to support BOSKALIS with the design & engineering. The installation support structure was built and installed by the SEAGULL GROUP, our partner in Singapore.





60 views

Recent Posts

See All

コメント


bottom of page